
Repair of Mandrel Fracture in Oil Casing Production Line
Problem: Fatigue fracture occurred at the mid-span of the mandrel, resulting in production line shutdown.
Solution: WC-Co coating applied by plasma spraying;Local welding reinforcement.
Result: Repaired mandrel operated normally for 14+ months,Prevented over 3 million RMB in direct losses.